Title
Professional Services Agreement with Walter P. Moore and Associates for Professional Engineering Services associated with the Lake Pflugerville Phase 2 Project (PA2402) in the amount of $1,831,821.
Summary
This item considers approval of a Professional Services Agreement (PSA) with Walter P. Moore and Associates, Inc. in the amount of $1,831,821 for engineering, environmental, design, and construction management services related to the Lake Pflugerville Phase 2 Park Project, identified in Proposition B of the 2020 Bond Election.
Lake Pflugerville is one of the most highly visited parks in the City’s system, with over 375,000 visits in 2025. Phase 2 builds upon the 2019 Preliminary Design Report and focuses on improvements to the north and west sides of the lake to expand access, diversify recreation opportunities, and enhance the overall user experience.
Planned improvements include erosion control and repairs to the beach area, upgraded restroom facilities, additional shade structures and walkways, and destination/regional play features. The project also includes construction of a new trailhead off Silent Harbor Loop with parking, lighting, landscaping, and expanded pedestrian access. In addition, a boardwalk network through the existing wetlands with covered overlooks will provide opportunities for environmental education and wildlife viewing.
While the project builds upon the 2019 Preliminary Design Report and prior master planning efforts, additional community engagement will be conducted as part of the design process to ensure the project reflects current community needs, usage patterns, and growth since those plans were developed. As part of this effort, Walter P. Moore will also conduct early feasibility analyses to evaluate site constraints, challenges, and opportunities, particularly related to the beach area, boardwalk, and environmental considerations such as shoreline stabilization and erosion control, to help refine the project scope and inform design decisions.
The City conducted a qualifications-based selection process, resulting in the selection of Walter P. Moore and Associates, Inc. as the most qualified firm. The City has prior experience working with Walter P. Moore and their subcontractors, including TBG Partners, on similar projects. The proposed cost for design, engineering, environmental, and construction management services is consistent with industry standards, representing approximately 15-20% of total project costs.
The City has already implemented initial improvements at Lake Pflugerville, including expanded parking and restroom facilities, as part of a phased approach to advancing the Master Plan.
Approval of this agreement allows the project to move into design and continue implementation of the Lake Pflugerville Master Plan while supporting continued growth and usage at the site.
This item is supported by the Mobility Infrastructure & Connectivity, Community Amenities & Events, and Community Social Fabric & Neighborhood Character pillars of the Strategic Plan.
Prior City Council Action
N/A
Deadline for City Council Action
Action is requested April 14, 2026.
Funding Expected: Revenue __ Expenditure X_ N/A __
Budgeted Item: Yes X_ No __ N/A __
Budget Source: _2020 Bond_
Budgeted Amount: _$10,654,017_
Amount: _$1,831,821_
1295 Form Required? Yes X_ No __
Legal Review Required: N/A __ Required X_ Date Completed: _3/13/2026_
Supporting documents attached:
Professional Services Agreement
2014 Lake Pflugerville Master Plan
2019 Lake Pflugerville Preliminary Design Report
Recommended Action
Approve the professional services agreement with Walter P. Moore and Associates for Professional Engineering Services associated with the Lake Pflugerville Phase 2 Project.