Pflugerville Banner
File #: 2012-1481    Version: 1 Name: Highland Park Phase B Revised Preliminary Plan
Type: Agenda Item Status: Consent Agenda
File created: 10/23/2012 In control: Planning and Zoning Commission
On agenda: 11/5/2012 Final action:
Title: Consider a Revised Preliminary Plan for Highland Park Phase B; an 84.74-acre tract of land out of the Thomas G. Stuart Survey No. 6, Abstract No. 689, in Travis County, Texas., in Pflugerville, Texas. (PP1209-01)
Attachments: 1. Staff Report, 2. Highland Park Phase B Revised Preliminary Plan
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Title
Consider a Revised Preliminary Plan for Highland Park Phase B; an 84.74-acre tract of land out of the Thomas G. Stuart Survey No. 6, Abstract No. 689, in Travis County, Texas., in Pflugerville, Texas. (PP1209-01)
 
Summary
The proposed revision impacts 96 lots and is a reflection of the Second Adjustment to the Highland Park ALUR Development Code, approved administratively on August 9, 2012. Minor changes, revisions and modifications to the Highland Park Development Code and Regulating Plan that do not substantially increase the overall density of development in Highland Park may be approved administratively (City Manager) and includes adjustments to street alignments, district boundaries and location of street types, lot types, open space, flood plains utility facilities, and utility easements. The proposed revision reflects a reduction in residential lots from 290 to 282 as a result of proposed changes to product adjustments and lot type. Additional modifications have been made to lot configuration as well as minor modification to the Street Type standards in order to increase lane width. Phases specifically impacted through the revision include Phase B-4, B-5, B-6, B-9, B-10, B-12 and B-13.The proposed revision will not adversely impact traffic within the subdivision. Retail water and wastewater will continue to be provided by the City of Pflugerville. The Highland Park subdivision remains subject to the provisions associated with the Travis County MUD No. 5, in which Manville is the wholesale water provider.
 
Staff Recommendation
Staff recommends approval of the revisions identified in the staff report and identified in the Highland Park Phase B Revised Preliminary Plan.
 
Drafter
Jeremy Frazzell, Senior Planner