Title
Professional services supplemental agreement with STV, Inc.in the amount of $1,940,480 for additional schematic layout development, hydrology and hydraulic analysis, surveying, and project management associated with the extension of Melber Lane across Wilbarger Creek and continuing north of Pleasanton Parkway to the future roadway connection planned to the northern limit of the floodplain, along with preparation of Plans, Specifications, and Estimates (PS&E) for the segment from Cameron Road to Pleasanton Parkway, and Bid and Construction Phase Services required for delivery of the TR1906 - Melber Lane project.
Summary
The City is considering approval of a Professional Services Supplemental Agreement (PSSA) with STV, Inc. in the amount of $1,940,480 to provide additional engineering and design services for the TR1906 Melber Lane Project.
The original Professional Services Agreement and prior supplemental agreements included preliminary engineering, design, and coordination services for the Melber Lane project. As the project progresses, additional services are required to advance the schematic design and prepare final construction documents.
This Supplemental Agreement includes preliminary engineering (30% design) for the ultimate four-lane divided section of Melber Lane from Pleasanton Parkway to Ashton Woods, as well as development of Plans, Specifications, and Estimates (PS&E) for the segment from Cameron Road to Ashton Woods. The scope also includes environmental studies, public involvement, surveying and mapping, traffic studies, and geotechnical investigations necessary to support project development.
Approving this Professional Services Supplemental Agreement ensures the project continues to advance through design with the necessary technical analyses and coordination, supporting the City’s ability to deliver the Melber Lane improvements.
This item is supported by the Mobility Infrastructure and Connectivity pillar of the Strategic Plan.