Title
Approving the selection of Cobb Fendley & Assoc., Inc. for professional engineering services associated with design, bidding, and construction administration of the E. Pflugerville Parkway and SH130 Interchange 2014 General Obligation Bond Project and authorizing the City Manager to enter into negotiations regarding a scope of work and fee proposal.
Summary
The City of Pflugerville solicited requests for qualifications from engineering firms to perform design services, bidding and construction administration for the E. Pflugerville Parkway and SH130 Interchange 2014 General Obligation Bond Project.
This project will be the reconstruction of East Pflugerville Parkway to a 2-lane urban/suburban street section from Colorado Sand to Becker Farm Road AND widening of the SH130 underpass to accommodate the ultimate six-lane section. Preparation of the final engineering construction documents shall include but not be limited to: project design, topographic surveys where required, geotechnical investigation, environmental assessment and environmental clearances, identification of utility conflicts, required utility adjustments and replacements, coordination with utility companies, determination of ROW/easement acquisition, preparation of ROW/easement acquisition metes/bounds and sketch, preliminary and final engineer’s opinion of probable construction cost, project manual and any other items necessary to successfully construct this project.
This project will be designed in accordance with the City of Pflugerville’s 2014 Edition of the Unified Development Code and 2014 Edition of the Engineering Design Guidelines & Construction Manual.
Status
City staff received twelve (12) proposals. A review team made up of Engineering Department Staff reviewed and scored the proposals. It was determined to initially review all proposals to create a short list. After the initial grading, an additional review was conducted on all short listed firms relative to each City bond p...
Click here for full text