Pflugerville Banner
File #: 2022-1077    Version: 1 Name: Grove at Blackhawk Sec 2
Type: Agenda Item Status: Consent Agenda
File created: 11/1/2022 In control: Planning and Zoning Commission
On agenda: 11/7/2022 Final action:
Title: Approving a Final Plat for Grove at Blackhawk, Section 2, an approximately 35.272-acre tract of land situated in the James P. Kempe Survey No. 12, Abstract No. 464 and the Juan Zambrano Survey No. 38, Abstract No. 845; Travis County, Texas, generally located north of Cele Road, east of Hodde Lane, and west of Melber Lane (2022-22-FP).
Attachments: 1. Staff Report, 2. Final Plat
Title
Approving a Final Plat for Grove at Blackhawk, Section 2, an approximately 35.272-acre tract of land situated in the James P. Kempe Survey No. 12, Abstract No. 464 and the Juan Zambrano Survey No. 38, Abstract No. 845; Travis County, Texas, generally located north of Cele Road, east of Hodde Lane, and west of Melber Lane (2022-22-FP).

Summary
The property is generally located north of Cele Road, east of Hodde Lane, west of Melber Lane, in the extraterritorial jurisdiction (ETJ) of the City of Pflugerville. The subject property is in the ETJ and not subject to the city’s zoning ordinance. The property is governed by the Lakeside MUD No. 5 Comprehensive Development Agreement which limits the uses within this section of the development to the Single-Family Residential (SF-R) District and the commercial/retail lot will follow the zoning district requirements for the City of Pflugerville’s Neighborhood Services (NS), or Retail (R) District requirements, as stated in the Amended and Restated Comprehensive Development Agreement (Lakeside MUD No. 5). The final plat proposes to establish five (5) blocks with 64 single-family lots, two (2) MUD drainage/ public utility/access easement lots, one (1) commercial/retail lot, two (2) landscape lots managed by the HOA. This final plat is tied to the Grove at Blackhawk Preliminary Plan (PP1909-01) that was approved on December 7th, 2020. The remainder area will be filled with right-of-way dedication and pedestrian access routes. Right-of-way dedication is proposed along Cele Road extending 57’ into the property along the extent of the road. Right-of-way dedication for seven (7) streets has been included in this proposed plat. Each proposed street will be 50-feet wide apart from Janke Lane, which will be 70 feet wide. The total ROW dedication will be 3.875 acres. The “Boundary Road Construction Payment” is $1,200 per lot per the Development Agreement. The “Road Infrastructure Payment” is based on the TIA. The Roadway Impact...

Click here for full text