Pflugerville Banner
File #: 2013-2509    Version: 1 Name: Replat of Lot 2C-Renewable Energy Park
Type: Agenda Item Status: Public Hearing
File created: 11/18/2013 In control: Planning and Zoning Commission
On agenda: 12/16/2013 Final action: 12/16/2013
Title: To receive public comment and consider an application to Replat Lot 2C of the Renewable Energy Park subdivision into Lot 2C and 2D, to be known as the Replat of Lot 2C-Renewable Energy Park. (FP1311-01)
Attachments: 1. Lot 2C Renewable Energy Park staff report, 2. Replat of Lot 2
Title
To receive public comment and consider an application to Replat Lot 2C of the Renewable Energy Park  subdivision into Lot 2C and 2D, to be known as the Replat of Lot 2C-Renewable Energy Park. (FP1311-01)
 
Summary
The proposed Replat of Lot 2C consists of a 16.118-acre tract located generally southeast of the Helios Way and Sun Light Near Way intersection within the commonly known SH 130 Commerce Center. The proposed Replat is consistent with the revised preliminary plan and includes a division of Lot 2C into two total lots to establish Lots 2C, 2D, and a portion of the northern extent of Impact Way. The SH 130 Commerce Center Phase 2 construction plans were recently approved for the Phase 2 public improvements and construction is eminent. The proposed financing of Phase 2 includes city issued bonds payable by PCDC, therefore fiscal security was not required prior to the Final Plat. A segment of Impact Way, an industrial collector level street is included in the Replat and will provide a public street connection between E. Pecan St. and Helios Way. The former Replat of Lot 2 identified a portion of the proposed right of way through a driveway and temporary access easement off of E. Pecan St. With the establishment of Impact Way, the former temporary access easement is automatically vacated with this Replat. As noted on the plat, vehicle turning movements from the former driveway/Impact Way will be limited to a right in, right out condition when E. Pecan St. is further improved in the future. Water and wastewater will continue to be provided by the City of Pflugerville and the extension of utility lines to service all of the proposed lots were included in the SH 130 Commerce Center Phase 2 construction plans.
 
Staff Recommendation
Through agreements between the City and PCDC, the proposed subdivision meets the minimum requirements and Staff recommends approval of the Replat of Lot 3C Renewable Energy Park.
 
Drafter
Jeremy Frazzell, Senior Planner