Title
Approving a Professional Services Supplemental Agreement with CP&Y, Inc. in the amount of $201,365.00 to provide professional services associated with the SH 130 Wastewater Extension Project, and authorizing the City Manager to execute the same.
Summary
The Professional Services Supplemental Agreement under consideration provides for final design and construction phase services for the 15-inch North Wilbarger Wastewater Interceptor Project.
CP&Y, Inc. (Engineer) will provide additional engineering services for the City of Pflugerville’s (City’s) SH 130 and SH 45 Water and Wastewater Extensions project. The additional services are under the title N. Wilbarger Interceptor project, hereinafter referred to as the “Project.” Engineering services will include the design, bid and construction phase services of a wastewater line extension totaling approximately 1,600 LF from an existing connection crossing from the east to the west side of SH 130 to provide service to the area northwest of the highway interchange of SH 130 and SH 45 in the Wilbarger Drainage Basin. The evaluation includes elements needed to develop alignment and design the extension, coordination with TxDOT and private utility owners, environmental engineering, survey, and subsurface utility engineering work. It is assumed that existing conditions will be such that bore and jack construction can be utilized for the trenchless segment.
Background:
CP&Y was previously selected to design this wastewater line as part of the SH130 and SH45 Water and Wastewater Extensions project, which included three wastewater lines crossing these highways to an unserved area northwest of SH130 and SH45. The North Wilbarger Interceptor segment was removed from the project based on an adjustment to the wastewater master plan strategy at that time to convey all flow from this area entirely to the Central Basin to the south across SH45, rather than splitting some of the flows to the Wilbarger Basin across SH130 to t...
Click here for full text