Pflugerville Banner
File #: 2013-2510    Version: 1 Name: Replat of Lot 3C-Renewable Energy Park
Type: Agenda Item Status: Public Hearing
File created: 11/18/2013 In control: Planning and Zoning Commission
On agenda: 12/16/2013 Final action: 12/16/2013
Title: To receive public comment and consider approving a Replat of Lot 3C Renewable Energy Park; a 108.427-acre tract of land out of the William Caldwell Survey No. 162, generally located southwest of the Pecan St and SH 130 intersection in Pflugerville, Texas. (FP1311-02)
Attachments: 1. Lot 3C Renewable Energy Park staff report, 2. REPLAT-LOT 3
Title
To receive public comment and consider approving a Replat of Lot 3C Renewable Energy Park; a 108.427-acre tract of land out of the William Caldwell Survey No. 162, generally located southwest of the Pecan St and SH 130 intersection in Pflugerville, Texas. (FP1311-02)
 
Summary
The proposed Replat of Lot 3C consists of a 108.427-acre tract located generally southeast of the Helios Way and Sun Light Near Way intersection within the commonly known SH 130 Commerce Center. The proposed Replat is consistent with the revised preliminary plan and includes a division of Lot 3C into four total lots to establish Lots 3C, 3D, 3E, 3F, and a portion of the southern extent of Impact Way. The SH 130 Commerce Center Phase 2 construction plans were recently approved for the Phase 2 public improvements and construction is eminent. The proposed financing of Phase 2 includes city issued bonds payable by PCDC, therefore fiscal security was not required prior to the Final Plat. Water and wastewater will continue to be provided by the City of Pflugerville and utility line extensions needed to service all of the proposed lots were included in the SH 130 Commerce Center Phase 2 construction plans and will be provided. A tree survey was provided within the preliminary plan and several trees were identified to be removed with the SH 130 Commerce Center Phase 2 public improvements. The tree mitigation fee was paid at time of construction plan approval.  
 
Staff Recommendation
Through agreements between the City and PCDC, the proposed subdivision meets the minimum requirements and Staff recommends approval of the Replat of Lot 3C Renewable Energy Park.
 
Drafter
Jeremy Frazzell, Senior Planner