Pflugerville Banner
File #: 2018-7162    Version: 1 Name: Vine Creek Phase 3 & 4 Final Plat (FP1805-03)
Type: Agenda Item Status: Consent Agenda
File created: 11/1/2018 In control: Planning and Zoning Commission
On agenda: 11/5/2018 Final action:
Title: Approving a Final Plat for the Vine Creek Phase 3 & 4; a 24.392-acre tract of land out of the Juan Zambrano Section No. 38, Abstract No. 845 in Travis County, Texas. (FP1805-03)
Attachments: 1. Vine Creek Phase 3 & 4_Staff Report, 2. Vine Creek Phase 3 & 4_Final Plat
Title
Approving a Final Plat for the Vine Creek Phase 3 & 4; a 24.392-acre tract of land out of the Juan Zambrano Section No. 38, Abstract No. 845 in Travis County, Texas. (FP1805-03)

Summary
The property within the Vine Creek subdivision, generally at the northwest corner of Cele Road and Melber Lane. The property was annexed into the City of Pflugerville in 2006 (ORD No. 853-06-12-12) and rezoned to the Single Family Residential (SF-R) and Single Family Mixed Use (SF-MU) districts in November 2015. The final plat consists of 137 single-family residential lots, two (2) landscape P.U.E. and D.E. lots, one (1) and access lot. The configuration of the subdivision is consistent with the subdivision’s utilization of both the SF-R and SF-MU zoning districts. Phase 3 & 4 include both 40’ and 50’ wide lots following the requirements of the SF-MU and SF-R zoning district. Phase 3 & 4 of the Vine Creek subdivision is just east of Phase 1 and shares the easternmost border of the subdivision with Melber Lane. Cele Road is currently two-lane, predominantly county roadway with roadside ditches. Phase 3 & 4 includes right of way dedication to assist in the future expansion and straightening of Cele Road and Melber Lane to four lane, divided arterial sections. The plat includes the extension of Shafer Drive, Zinfandel Drive, and Beringer Drive, 60’ Right-of-Ways and the construction of six (2) 60’ Right-of-Ways including: Caymus Drive and Cloudy Bay Drive. Upon completion, the streets and drainage improvements will be accepted through Travis County Commissioner’s Court for maintenance. The property is located within the Manville Certificate of Convenience and Necessity (CCN), therefore Manville will be the water provider to the development. Wastewater service will be by the City of Pflugerville. Per previous agreements, this property was allowed to utilize the central plant for wastewater service. A lift station is proposed in the eastern portion of the development, near Melb...

Click here for full text