Title: Discussion regarding the Pflugerville Colorado River Water Supply Analysis and future water supply options.
Attachments: 1. Pflugerville CO River Water Supply Council Update 2021 12 14
Title
Discussion regarding the Pflugerville Colorado River Water Supply Analysis and future water supply options.

Summary
The purpose of this presentation is to provide a summary overview of the results from the Preliminary Engineering Report completed for the Pflugerville Colorado River Water Supply Analysis.

In conjunction with the City’s planned Water Treatment Plant Expansion project that is currently under design, the City has also evaluated water supply alternatives to support the future of Pflugerville. The City retained Garver to provide Owner’s Representative services as the Owner’s agent and liaison between the Design Consultants, Construction Contractors, Texas Commission on Environmental Quality (TCEQ), Texas Water Development Board (TWDB), and other stakeholders for the Pflugerville Water Treatment Plant Facility Expansion Project and water supply evaluation. The City is growing rapidly and needs to ensure adequate water supply for its customers within the next five to ten years as well as prepare for expansive future growth by full buildout.

The permanent water supply option to expand the City’s existing pump station and raw water pipeline that conveys water from the Colorado River to Lake Pflugerville was selected as the initial option to expand water supply for Pflugerville given the City’s ability to deliver the project within the projected time period and to add redundancy and resiliency to the City’s existing water supply. This PER focused on an analysis of the feasibility of constructing this project in the near-term. Other water supply options defined in the Water Supply Evaluation, such as the HB 1437 Interbasin Transfer and Round Rock Emergency Interconnect projects, are still under evaluation with the relevant stakeholders, and will be further evaluated under a separate Supplemental Agreement at a later date, once details are better-defined. A Memorandum of Intent Related to the Provision of Treated Wastewater Effluent From the Braz...