Pflugerville Banner
File #: 2016-5372    Version: 1 Name: Timmerman Subdivision Preliminary Plan
Type: Agenda Item Status: Consent Agenda
File created: 11/14/2016 In control: Planning and Zoning Commission
On agenda: 12/5/2016 Final action: 12/5/2016
Title: Approving a Preliminary Plan for Timmerman Subdivision, a 72.90-acre tract of land out of the Taylor S. Barnes Survey No. 46, Abstract No. 67 and William Caldwell Survey No. 66, Abstract No. 162 in Pflugerville, Texas. (PP1605-03)
Attachments: 1. Timmerman Subdivision Preliminary Plan Staff Report, 2. Timmerman Subdivision Preliminary Plan
Title
Approving a Preliminary Plan for Timmerman Subdivision, a 72.90-acre tract of land out of the Taylor S. Barnes Survey No. 46, Abstract No. 67 and William Caldwell Survey No. 66, Abstract No. 162 in Pflugerville, Texas. (PP1605-03)

Summary
The proposed subdivision is located southwest of the Sun Light Near Way and E. Pecan Street intersection, in the city limits. The property was annexed in 2015 and later that year rezoned to Corridor Urban Center Level 5 (CL5) (ORD No. 1234-15-10-27). Prior to voluntary annexation, the developer and the city entered into a development agreement to address the development of the property, including the extension of public infrastructure. The preliminary plan consists of 13 total lots, with one lot planned for a multi-family use. The remaining lots are anticipated to have restaurant, retail, office, and office/warehouse land uses. A large drainage easement is provided in the southeastern portion of the tract and planned as a regional detention for the development.

The preliminary plan consists of 13 total lots, with one lot planned immediately for a multi-family use. The remaining lots are anticipated to have restaurant, retail, office, and office/warehouse land uses. A large drainage easement is provided in the southeastern portion of the tract and planned as a regional detention for the development. Water and wastewater utility service will be provided by the City of Pflugerville. Water will be constructed by the City of Pflugerville as a part of the Helios Way Capital Improvement Project. Wastewater will be constructed by the developer and as each lot is planned for development. Access within the subdivision will be from Biltmore Avenue and Helios Way, two streets that were platted separately and are being constructed by the City in accordance with the development agreement. As noted on the preliminary, the proposed lots are not planned to have access from E. Pecan Street or Sun Light Near Way, and will be limited to p...

Click here for full text