Pflugerville Banner
File #: 2019-7428    Version: 1 Name:
Type: Agenda Item Status: Approved
File created: 3/1/2019 In control: Engineering Dept
On agenda: 3/12/2019 Final action: 3/12/2019
Title: Approving a supplemental agreement with Freese and Nichols, Inc.in the amount of $64,991.00 for professional engineering services associated with the Wastewater Master Plan.
Attachments: 1. Professional Services Supplemental Agreement No 2, 2. ORD 1179-14-06-10
Title
Approving a supplemental agreement with Freese and Nichols, Inc.in the amount of $64,991.00 for professional engineering services associated with the Wastewater Master Plan.

Summary
The City of Pflugerville is seeking to update the existing wastewater impact fees, consistent with the requirements of Chapter 395 of the Texas Local Government Codes. The update process requires engaging a Registered Professional Engineering Firm to prepare documentation and calculations. Freese and Nichols has been previously selected to provide engineering services associated with the Wastewater Master Plan Update, therefore the City seeks for the consultant to include a separate document for the Wastewater Impact Fee Study.

Specific tasks include updating study areas, updating an existing conditions analysis, determining the growth in wastewater flows for the 10-year planning period, reviewing and updating the wastewater impact fee capital improvements program, updating the service unit equivalency table and calculating the maximum fee per service-unit for the wastewater system. The wastewater study will have two study areas: the Central Basin and the Cottonwood/Wilbarger Basin, and separate impact fee calculations will be conducted for each study area.

The results of the Wastewater Impact Fee study will be coordinated through a Capital Improvements Advisory Committee (which is anticipated to be appointed by the City Council on anticipated for the March 26th City Council agenda) and culminate with adoption through a public hearing process. The Capital Improvements Advisory Committee as selected for the Water Impact Fee study will serve as the same committee for the Wastewater Impact Fee study for review and recommendations regarding each. Committee meetings public hearing process will include discussions for both water and wastewater results.

The current wastewater impact fees were adopted by ordinance on June 10, 2014, a copy of which is attached for reference

Prio...

Click here for full text