Pflugerville Banner
File #: 2020-8645    Version: 1 Name: Lisso Tract Ph 2 Final Plat
Type: Agenda Item Status: Consent Agenda
File created: 9/3/2020 In control: Planning and Zoning Commission
On agenda: 11/2/2020 Final action:
Title: Approving a Final Plat for Lisso Tract Phase 2, a 38.138-acre tract of land out of the Alexander Walters Survey NO. 67, Pflugerville, Texas. (FP2008-01)
Attachments: 1. Lisso Tract Ph 2 FP Staff Report, 2. Lisso Tract Phase 2 Final Plat
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title

Approving a Final Plat for Lisso Tract Phase 2, a 38.138-acre tract of land out of the Alexander Walters Survey NO. 67, Pflugerville, Texas. (FP2008-01)

 

Summary

The property is generally located northeast of the Wells Branch Parkway and Killingsworth Lane intersection. The property is zoned Single Family Residential (SF-R). The final plat proposes to establish 76 residential lots and 3 HOA/open space/drainage lots and 1 parkland lot. The remaining acreage will be dedicated right of way, which will be developed with the required four (4) foot sidewalks and six (6) foot sidewalks and where applicable a ten (10) foot hike and bike trail. This is the second phase of the proposed Lisso Tract Preliminary Plan and is a section of the overall proposed residential development. This phase and phase one combine to create the eastern portion of the subdivision. Right of way dedication is included for the extension of the following streets with 50 foot ROW widths: Purple Martin Drive, Holloway Drive, Bithal Street, Bradham Way, and Ollie Briar Street. The Planning and Zoning Commission approved a Subdivision Variance for the total number of lots for phases one and two maintain access off E Pfennig Lane without the completion of the full extent of Purple Martin Dr. at this time. Utility service will be provided by the City of Pflugerville. Parkland dedication has been included for phase 1 and phase 2. The total parkland required to be dedicated is 5.9 acres: 4.4 for phase 1 and 1.5 for phase 2. The total parkland dedicated is 19.825 acres. Tree mitigation will be required prior to any tree being removed.

 

Staff Recommendation

The final plat meets the minimum state and local requirements, Staff recommends approval.

 

Drafter

Emily Draughon, Planner II