File #: 2020-8743    Version: 1 Name:
Type: Agenda Item Status: Approved
File created: 10/15/2020 In control: Engineering Dept
On agenda: 10/27/2020 Final action: 10/27/2020
Title: Discuss and consider action to approve a professional services agreement with Kimley-Horn and Associates, Inc. in the amount of $858,059.35 for professional engineering services associated with the Wilbarger Creek Wastewater Interceptor project and authorizing the City Manager to execute the same.
Attachments: 1. PSA KH_Wilbarger Interceptor, 2. Location Map.WCWWI, 3. Draft Presentation_2020-8743
Title
Discuss and consider action to approve a professional services agreement with Kimley-Horn and Associates, Inc. in the amount of $858,059.35 for professional engineering services associated with the Wilbarger Creek Wastewater Interceptor project and authorizing the City Manager to execute the same.

Summary
This item is for Preliminary Design of the proposed Wilbarger Creek Wastewater Interceptor project, identified as Project 8 in the adopted 2020 Wastewater Master Plan.

The City’s wastewater service area includes three basins, the Central, Wilbarger, and Cottonwood basins. Currently, lift stations and pumping infrastructure is in place to convey wastewater flows across basins from the Wilbarger basin to the Central basin and into the Central Wastewater Treatment Plant.

The adopted 2020 Wastewater Master PIan recommended the City proceed with improvement projects in the Wilbarger Basin to provide conveyance of wastewater from the Wilbarger and Cottonwood basins to a new wastewater treatment plant in the Wilbarger Basin. The 2020 Wastewater Master Plan indicates that these improvements will need to be in service by late 2024 to meet the City’s projected growth needs.

The Wilbarger Creek Wastewater Interceptor will convey flows from the existing Carmel Lift Station to the proposed Wilbarger Creek RWWTF. The Wilbarger Creek RWWTF project is part of a separate agenda item and will be completed on a similar schedule.

Kimley-Horn has been selected by the City for engineering services associated with the Wilbarger Creek Wastewater Interceptor. The professional service agreement negotiated between the City and Kimley-Horn is through Preliminary Design, and is composed of the following scope of services:

1. Design Management and Data Collection
2. Analysis, Routing, and Conceptual Design
3. 30% Plans and Engineering Feasibility Report
4. Boundary Survey
5. Environmental Services
6. Subsurface Utility Engineering
7. Right of Entry/Property Acquisition Services...