File #: 2021-0865    Version: 1 Name:
Type: Agenda Item Status: Approved
File created: 8/11/2021 In control: Engineering Dept
On agenda: 9/14/2021 Final action: 9/14/2021
Title: Discuss and consider action to award a construction contract for the North 2.5 MG Elevated Storage Tank to Landmark Structures I, L.P. the lowest responsible bidder of three (3) accepted bids received on September 2, 2021, in the amount of $7,451,000.00 and authorizing the City Manager to execute same.
Attachments: 1. North 2.5 MG EST Recommendation of Award Letter FNI, 2. Draft Presentation_2021-0865
Title
Discuss and consider action to award a construction contract for the North 2.5 MG Elevated Storage Tank to Landmark Structures I, L.P. the lowest responsible bidder of three (3) accepted bids received on September 2, 2021, in the amount of $7,451,000.00 and authorizing the City Manager to execute same.

Summary
The City contracted with Freese and Nichols, Inc. for the design of the North 2.5 MG Elevated Storage Tank. This project involves installation of one 2.5 million gallon composite elevated tank, including all electrical, instrumentation, site work, and appurtenances; approximately 600 feet of 24-inch water line; approximately 80 feet of 48-inch steel casing pipe installed by other than open cut. This project will connect to an existing 16-inch water line that travels along Pfennig Lane. The 24-inch water line will be installed using open cut and the 48-inch casing pipe will be installed using other than open cut construction methods. The water line will be installed to a minimum depth of 48-inches.
The purpose of this project is to increase the City’s elevated storage capacity to accommodate the anticipated growth. The City’s current capacity is at 95% of its limits. Installation of this water line will alleviate the strain on the existing water system and allow the City to maintain compliance with TCEQ requirements of having a minimum of 100 gallons in elevated storage per connection to the water system.
This item is for the award of a construction contract for the North 2.5 MG Elevated Storage Tank project, which is identified as Capital Improvement Plan Project No. 1 in the 2019 Water Master Plan Update. Notices for the bid opening were posted in the Pflugerville Pflag as required on August 4, 2021. The bidding process was facilitated through a plan holder website, civcastusa.com. The City of Pflugerville opened bids for the project on August 19, 2021 at 2pm. Three (3) bids were received and publicly opened and read aloud in a virtual bid opening...