Pflugerville Banner
File #: 2023-0122    Version: 1 Name:
Type: Presentation Status: Discuss only
File created: 1/24/2023 In control: Planning and Zoning Commission
On agenda: 2/6/2023 Final action:
Title: Discussion regarding the FM685 Corridor Study
Attachments: 1. Draft FM 685 Corridor Study

Title

Discussion regarding the FM685 Corridor Study

 

Summary

The FM685 Corridor Study is for the development of a proposed concept for potential multimodal improvements for FM 685/Dessau Road between Wells Branch Parkway and SH 130 to address congestion, pedestrian and bike connectivity and safety, and traffic flow at intersections. The corridor study was listed as a high-priority project in the 2020 Bond Election.

 

The project will deliver a preferred FM 685 concept that will enable the City to develop a schematic design and begin environmental scoping with the Texas Department of Transportation (TxDOT) to eventually obtain National Environmental Policy Act (NEPA) clearance as well as prepare for right-of-way acquisition and the relocation of utilities.

 

City staff and the City’s consultant for the project, Kimley-Horn and Associates, will provide information on the project design and results of the public engagement that has occurred during the course of the project.

 

Supporting documents attached:

Draft FM 685 Corridor Study

 

Recommended Action

Discuss only.